Hammersmith Bridge – The plan to rebuild

Hammersmith Bridge in London is a fine example of engineering expertise. First built in 1887, it crosses the River Thames between Hammersmith and Barnes, and was designed by Sir Joseph Bazalgette. It is 13m wide and 210m long, with a central roadway and pedestrian crossing on either side. It is also London’s weakest bridge, with a 7.5 tonne limit and recent traffic flow, predominately for single-decker buses, has been controlled by traffic lights[1].

(more…)

Digital Twin for Earth

The European Union’s ten-year initiative, Destination Earth, involves the creation of a digital twin of earth.
The highly accurate digital model of earth will map climate development and extreme events as accurately as possible in space and time. Observational data will be continuously incorporated into the digital twin to predict possible future trajectories. Information available from the earth’s twin will be used to:

https://www.amcouncil.com.au/news/56-member-news/100097-digital-twin-for-earth.html

(more…)

VLine Receives Accreditation to ISO55001

V/Line has been certified to the ISO 55001:2014 Asset Management System following an audit of its policies, framework and procedures by BSI Group last year.
The certification applies to all V/Line assets, including trains, tracks, signals, stations, structures and ICT, and acknowledges work done in all parts of the asset management process, including strategic planning, financial management, assurance, risk management and planning along with physical inspections, maintenance and renewal programs.

(more…)