Feb 16, 2017 | MRiAM News
The Asset Management Council has released the next issue in its series of e-books exploring commonly asked Asset Management Questions. This paper addresses the belief that there is no difference between maintenance based on the assessed condition of an item and the maintenance of an item that degrades to the point of functional failure.
(more…)
Dec 14, 2016 | Member News
In accordance with Section 34 of its Constitution, an election is to be held for the Board of Directors of the Asset Management Council Ltd, for the term 2017 – 2020. One member of the current Board of Directors is to retire at the AMCouncil 2017 Annual General Meeting and is ineligible to stand for re-election for the ensuing three-year term.
(more…)
Oct 25, 2016 | Data in Asset Management News
This paper assesses the potential consequences and associated risk levels for a major explosion following catastrophic failure of an hypothetical hydrogen-containing plant operating at elevated temperature and pressure. The plant is mooted as being located in an industrial area but with residential areas nearby. It considers the importance of fully open-air construction of such plants, of sufficient separation from surrounding communities and of free vertical discharge from pressure relief evices.
(more…)
Aug 18, 2016 | MRiAM News
Physical plant assets are tending to remain in service for beyond their design lifetime. Arguably, a greater professional input is needed into the maintenance and reliability engineering of these assets, yet few universities offer such content in undergraduate engineering degrees. Accordingly, postgraduate programs have been developed.
(more…)
Aug 18, 2016 | Data in Asset Management News
This paper presents a framework for assessing the impact of the data collection process on the validity of key measures in reliability. The quality of data is affected by many organisational and behavioural factors. The aims of developing this framework are to
(more…)
Jul 28, 2016 | MRiAM News
A Split System Approach (SSA) based methodology is presented to assist in making optimal Preventive Maintenance decisions for serial production lines. The methodology treats a production line as a complex series system with multiple PM actions over multiple intervals.
(more…)